Planning, capacity and forecasting

Live By plan Org adminManager
Who can use it
Managers and org admins. Sprints, Time Allocation and Investment Allocation are visible to every role, limited to what each role may see.
Where
Predictability category in the left navigation; Investment Allocation sits under Finance
Availability
Capacity is included from the Team plan, Business KPIs in the Business plan. Initiative forecast ranges and Business KPIs are being switched on workspace by workspace.

Answer “What will we finish, and when?” and see risk before a date slips.

These reports use what your teams actually finished before. None of them ranks a person. Teams smaller than your minimum group size are hidden everywhere on this page. Terms are defined in the metric glossary.

Sprints

Question: Do our sprints deliver what they commit to, and what changed along the way?

Find it under Predictability → Sprints. It lists sprints with:

  • Say/do: what was done against what was committed at the start.
  • Velocity, scope creep, unplanned share, bug share and carry-over.

Select a sprint to see its burnup and burndown. It has one point per day from the start to the end, or to today while the sprint runs.

Sprints come from your ticket tool.

  • For Jira, DevGlimpse takes the committed work when the sprint starts. It rebuilds later changes from the issue history.
  • So map the Sprint and story points fields under Admin → Ticket mappings first.
  • Without a mapped Sprint field, nothing is rebuilt. Without a points field, the committed points stay empty.
  • Sprints older than 90 days are not stored.
  • If your role may not see individual metrics, sprints are labelled by start day and scope changes are hidden.
  • The page never shows an assignee.

Capacity

By plan Capacity planning is included from the Team plan.

Question: How much can this team take on in the weeks ahead?

Find it under Predictability → Capacity, and pick a team or group in the filter bar.

How it works out each week:

  • It starts from working days, after weekends, holidays and planned absence.
  • It scales them by a focus factor (the share of working time you expect the team to spend on this work).
  • Expected output comes from the team’s own rate over the last 12 weeks.

Create a capacity plan

  1. Select Create plan (or Edit plan). Managers can edit plans for the teams and groups they are allowed to see. Org admins can edit any.
  2. Choose the window: 1 to 26 weeks, starting on a Monday, default 12.
  3. Choose the unit: points, tickets or pull requests.
  4. Choose the focus factor: 0.1 to 1.0, default 0.7.
  5. Enter planned absence in person-days per week for the whole team, never per person.
  6. Save. Every change is written to the audit log.
  • With fewer than 4 weeks of history, the report shows person-days but no expected output.
  • Ticket units need individual metrics visible to everyone. Otherwise they fall back to pull requests.

Throughput forecast

Question: When will these 30 items be done? How many can we finish by the end of the month?

On Predictability → Predictability, the Throughput forecast card answers both questions for one ticket team. Managers and org admins can use it.

  • It runs 10,000 simulated futures over the team’s last 84 days of throughput on working days.
  • It shows the 50th, 70th, 85th and 95th percentile dates or counts.
  • It needs at least 5 completions in that window, and says so when it does not have them.
  • Ask about 1 to 5,000 items, or a date from tomorrow up to two years out.
  • It is hidden while the team has fewer people than the workspace’s minimum group size (Admin → Settings). The people are the assignees of the tickets the team completed in those 84 days, counted through the contributor each assignee is linked to. When it is hidden, the card says how many people were counted and how many assignees are not linked to anyone.
  • An assignee from Linear, Jira or another ticket tool is linked automatically when their email matches exactly one contributor’s profile, sign-in or commit email. Link the rest by hand under Admin → Ticket mappings → Ticket users. See People and identities.

Initiative forecast and risk

Rolling out Probabilistic finish dates on initiatives are being switched on workspace by workspace. Initiative risk is on for everyone.

On Predictability → Initiatives:

Forecast

The Forecast column shows the 70% and 85% finish dates from a nightly simulation. The older straight-line date sits next to it, now labelled Linear estimate.

Risk

The Risk column rates each initiative on track, at risk or off track every night. It uses five signals, none about a single person:

  • a forecast later than the target date
  • no forecast at all (nothing completed in the last 28 days)
  • scope growth over 20% in 14 days
  • no progress for 14 days
  • a forecast that moved more than 7 days later in 14 days

How the rating is set:

  • One signal reads at risk.
  • Two signals, or a forecast past the target by more than a 3-day grace, read off track.
  • An initiative with no target date is at most at risk.
  • These numbers are the defaults. There is no screen to change them in the app.

Target dates and alerts

  • A manager or org admin can set or clear an initiative’s target date on this page. The next nightly run judges its risk against the new date.
  • With Alert me, a manager or org admin is told when an initiative’s risk gets worse. A cool-down stops it repeating.
  • Alerts name the initiative and overall figures, never a person.

Time allocation and investment allocation

Question: Where does the work go?

  • Predictability → Time Allocation shows the share of merged lines on features, bugs and maintenance. The unclassified and unticketed share is shown as coverage.
  • Finance → Investment Allocation shows the share of merged work per initiative, with the category split and the same coverage. It sits under Finance, next to Capitalization, and is on every plan.

How work is assigned:

  • A pull request’s lines are split equally among its linked tickets.
  • A ticket’s label decides its category first, and its issue type second.
  • Bug beats maintenance, and maintenance beats feature.
  • An initiative gets credit through its project. A project in several initiatives splits its lines equally.

An org admin sets the mapping under Admin → Ticket mappings → Workflow and categories.

Business KPIs

By plan, and rolling out Business KPIs are included in the Business plan and are being switched on workspace by workspace.

Question: Did the business number move while this initiative shipped?

  1. Open Admin → Business KPIs (managers and org admins). Define a KPI: a name, a plain-language definition, a unit (count, decimal, percent or currency), a cadence (daily, weekly or monthly), which direction is good, and an optional target.
  2. Record values by hand, or import a CSV with the header period_start,value, for example 2026-11-02,1250. A weekly KPI uses Mondays and a monthly one the first of the month. The import shows a preview first and writes nothing if any row is wrong.
  3. Link the KPI to an initiative, optionally with a comparison window.
  4. On Predictability → Initiatives, open the Outcomes section and pick an initiative and one of its linked KPIs to see both on one time axis.
Correlation, not causation These trends do not establish that the initiative caused the business outcome. The page says so every time.
  • KPI values are business numbers you enter. DevGlimpse imports none from other tools and never sends them to AI, share links or the executive report.
  • Missing periods stay gaps and zero is a real value. Nothing is filled in or averaged.
  • An initiative under your minimum group size shows no delivery history next to the KPI.
  • Developers do not see Business KPIs. Every change is written to the audit log.

Working agreements

Question: Are we keeping the rules we set ourselves?

Under Efficiency → Working agreements, a team or group picks up to 10 rules from a fixed list:

  • first review within N working hours (1 to 80)
  • pull requests of at most N lines (50 to 5,000)
  • merged within N days (1 to 30)
  • every pull request links a ticket
  • at most N open pull requests per member (1 to 10)

What happens next:

  • DevGlimpse checks every pull request each hour.
  • It lists the open exceptions and shows the week’s adherence.
  • Changing a threshold closes its open exceptions.

Managers edit agreements for the teams and groups they are allowed to see. Org admins can edit any. Everyone else can read them.